Welcome to factory-direct-buy
Dongguan Jeiyip Electrical Co.,Ltd
Dongguan Jeiyip Electrical Co.,Ltd
Sign in or Join Free Now!

Manufacturer Video

Contact Us

Street Address
Meishang building, Xinji Nancheng, Dongguan
Country/Region
China (Mainland)/Guangdong
Telephone

86--18507691725

6.5mm OD 13 Pin Din Vehicle Camera Cable For Car Security System
6.5mm OD 13 Pin Din Vehicle Camera Cable For Car Security System
  • >= 100  Piece US $
Supply Ability:
5000 Piece/Pieces per 0
Port:
shenzhen/guangzhou
Email:
Quantity:
Piece
  • Product Detils
  • Company Profile
Quick Details
Place of Origin:
China (Mainland)
Brand Name:
Jeiyip
Model Number:
Packaging & Delivery
In poly bag or carton
Product Description


6.5mm OD 13 Pin Din Vehicle Camera Cable For Car Security System



1. Specification :

Product Name13 Pin Din Vehicle Camera CableColorBlack
Working voltage12V,24VCable OD6.5mm
Jacket MaterialPVCWorking temperature-40℃~95℃
Aging Test240 hoursOil Resistivity20 hours
WiringGND, Power, Video, Audio, ShieldingWarranty5 years



2. Description :


Vehicle CCTV camera systems are getting more and more popular these days. And why shouldn’t they be? They are so useful. These camera systems monitor speed and location.


This cable is used for monitors of vehicle CCTV of commercial car, truck, trailer, RV, towing vehicle. It provide multiple adapter so that the monitor could be connected with power, cameras.



3. FAQ:

Are you a trading company or Factory?
We are factory.


How to guarantee the signal transmission stability, HD, Anti-interference?
All cable conductor and shielding are made of bare copper, then screened by copper wire and AL foil against the interference from other vehicle electronic signal to guarantee sable HD signal transmission.


How to control the quality?
1.Each product must be tested strictly to insure none of problem cables delivered to customer.
2.The cable jacket is produced in strict accordance with ISO6722-2006 standard, which is up to automobile security usage standard in oil resistant, UV, low temperature, flexing testing.
3.All raw materials meet the REACH, ROHS environmental protection requirement.


How long will it take to prepare a sample and finish mass production?
Sample takes about 2 working days while batch production round 10 days(depends on the specific orders).


What is the payment term?
TT, L/C, WESTERN UNION. If you like other payment method, please discuss with us.




Send your message to this manufacturer
Email:
Message:
Your message must be between 20-8000 characters
 

© 2015 - 2024, wfdbn.com All rights reserved.